You want a separate area to welcome customers and want the staff's workspace to be professional. There are many things for you to keep in mind when constructing office furniture. Please connect with AfA Design for specific advice!


Should you hire a full-service office furniture construction unit?

The benefits that a package construction unit brings will certainly not disappoint you, some typical benefits such as:

Effective coordination among stakeholders

If your project involves multiple individual construction units, assigning tasks, working from up-to-date drawings, and aligning the office site, all from any device, can be overwhelmingly hard.

Easy performance tracking

A complete office furniture construction unit will know exactly who did what. Create a specific schedule for upcoming work. From there, quickly adjust the working performance for each individual.

A package office furniture construction unit will bring you many benefits

Minimize risks during construction

All regulations to ensure construction safety will be taken care of by the package construction unit. It will not happen that only a few items are guaranteed.

What is a professional office furniture construction unit?

Office quality, construction time and working space will be the standard to evaluate whether the construction unit is professional or not. Specifically, the office must meet the following criteria:8

Lighting and ventilation

An office needs adequate lighting and ventilation. It helps a lot in increasing the efficiency and raising the morale of the workers. A well-lit and ventilated workplace w#ill reduce pressure on employees, and at the same time reduce physical and mental stress, thus increasing work efficiency.

Convenient space for customers and employees

While designing office furniture, it is necessary to consider the convenience of customers and employees. To meet the flexible space and have a toilet, dining, and resting area))).

 should choose a professional office furniture construction unit

See More: 

GUIDELINES FOR DESIGNING THE DIRECTOR'S ROOM TO FITS FENG SHUI

In line with the estimated fee

Construction costs will affect the total budget of the company. The completed office must be within the budget of the organization. There needs to be a balance between space requirements, organizational capacity, and costs to cover other extensions.

The furniture is well arranged

Working efficiency and quality of machinery and equipment depends on the layout. A reasonable layout creates attractiveness for the office. For interior items, machinery and equipment, if properly arranged, will increase their shelf life. This also helps in the internal arrangement of the office and saves costs.

AfA Design's construction process of office furniture in Hanoi

For us, the needs and satisfaction of our customers always come first. AfA Design always develops a specific process to implement by project, specifically:

Step 1: Assess your organization's needs

Need to determine the needs of all departments. We will conduct a consultation with the investor to approach the space requirements. The number of employees, methods and nature of works, equipment and machines. Current and future requirements need to be determined.

Step 2: Make a design plan

After assessing the needs, to have a modern office space, you must know about the available space of the office. Space then needs to be measured and a preliminary design was drawn up.

Step 3: Finalize the design

This is the third step in the office construction process. AfA Design will provide the tentative design of the office space. Some adjustments and changes I may make before the final design is completed.

Step 4: Conduct design verification before construction

While designing the office layout, many issues need to be ensured such as infrastructure, construction safety, project feasibility, etc. To avoid construction risks and arising other problems.

AfA Design is a professional office furniture construction unit in Hanoi

Step 5: Carry out construction

Once the design has been approved, construction will begin. During the construction process, AfA Design always ensures a construction supervisions department to monitor daily progress to ensure the progress of the work as well as handle problems.

Step 6: Handing over the project

After completing the construction process, AfA Design will conduct the acceptance test with the investor and hand over the project

Thus, with a clear and professional construction process, customers can be completely assured of the quality of the work.

.If you are interested in learning about issues related to office construction, please contact us at:

AfA Design

20th floor, Eurowindow building, 27 Tran Duy Hung, Cau Giay, Hanoi

Hotline:+84 (0)915-075-858

Tel:+84 (024) 3557-1385

Email: info@afa.com.vn

Web: https://afa.com.vn/

Fanpage: https://www.facebook.com/afa.design.vietnam/